Division 05 · Green Energy Data Center

Green-powered compute for the next decade.

A planned 12-megawatt, green-powered data center in Pakistan, purpose-built for AI training, blockchain infrastructure and validator nodes for DSR Blockchain.

Engineering specs

Design targets for the facility.

Every system is planned with N+1 redundancy and full energy metering. These are design targets; final figures are confirmed as the build progresses.

Power capacity

12 MW

Full build · expandable to 30 MW

Renewable mix

78%

Solar + hydro + grid offset

Cooling

PUE 1.18

Two-phase immersion + free-air

Rack density

45 kW/rack

Liquid-cooled GPU bays

Connectivity

400 Gbps

Triple-homed, sub-30ms to EU

Tier rating

Tier III+

N+1 redundancy across all systems

Four zones · one facility

AI, blockchain, validation and custody.

1,800 GPUs

AI compute zone

NVIDIA H200 and B200 clusters for AI training, AI agents and inference workloads, rentable in GPU-hour increments.

320 PH/s

Blockchain infrastructure bay

Purpose-built space for proof-of-work hardware and other blockchain workloads, run on the facility's green power.

240 nodes

Validator vault

Bare-metal nodes running validators for DSR Blockchain and other networks, offered as non-custodial node hosting.

Planned

Cold storage

An air-gapped, access-controlled vault for institutional self-custody, built to FIPS 140-3 standards.

Sustainability

Green by design.

Pakistan has 300+ days of sun and some of the lowest solar PPA prices in the world. The facility is planned alongside a dedicated 18 MW solar array and a long-term hydro PPA, so every model we train and every node we run carries a fraction of the carbon of a comparable facility on the US grid.

78%

Renewable energy mix at launch

1.18

Power Usage Effectiveness (industry average around 1.55)

0

Diesel generators on the critical path

100%

Waste heat recycled into an adjacent agri-greenhouse

Build timeline

From foundation to first rack.

  1. 1

    Q1 2026

    Land secured · Site survey

    In progress
  2. 2

    Q2 2028

    Phase 1 build (3 MW) · Solar array online

  3. 3

    Q3 2029

    First GPU and hardware racks live

  4. 4

    Q4 2030

    DSR compute marketplace opens

  5. 5

    2035

    Phase 2 expansion to 12 MW

  6. 6

    2035+

    Multi-site footprint: UAE · Turkey

Interested in the build?

Energy providers, hardware partners and future compute customers can talk to the build team today.